MECHANICAL PERMIT / PERMIT TO INSTALL
1. Mechanical Permit Form
2. Mechanical Plan (3-sets) – signed and sealed by PME; attached PTR and PRC ID
3. Photocopy of Building Permit/ Certificate of Occupancy
4. Cost Estimate / Bill of Materials
5. Equipment Specifications including Manufacturer’s Test Certificate
6. Supplemental documents for massive machinery (elevators (LDC), escalators, generator sets (FP&C) (SDA), boilers, etc.)
7. Authorization Letter / Sec Cert. / Notice of Award or Contract (for applications filed by contractor) – attach valid ID
8. PTR and PRC ID of PME (Photocopy) – with 3 specimen signatures
PERMIT TO OPERATE (NEW)
1. Mechanical Permit (Photocopy)
2. Certificate of Occupancy (Photocopy)
3. Approved Mechanical Plan (To submit 3 sets of as-built plan if there are changes in the approved plan)
4. Certificate of Completion (3 sets) – Originally signed and sealed by PME in-charge, contractor and owner
5. Certificate of Good Running Condition – Originally signed and sealed by PME and Contractor
6. PTR and PRC ID of PME (Photocopy) – with 3 specimen signatures
7. Supplemental Documents:
a. ELEVATORi. Load Test and Drop Test Result
b. AIR-CONDITIONING SYSTEM / REFRIGERATIONi. Leak Test Result for refrigerant pipes and Air Balancing Result for air-conditioning systemsc.
FIRE PROTECTION SYSTEM
i. Hydrostatic Test Result for sprinkler systemsd. GENERATOR SET
i. ECC Compliance / Decibel Reading
ii. Structural Stability Certificate (If the genset is not located on the ground floor), signed and sealed by Structural Engineer; Attach PTR and PRC ID- Certificate must state the gross weight of the genset and the grid location of the structural members that will support the machinerye.
TOWER CRANEi. Third Party Inspection Certificate (DOLE Accredited)
PERMIT TO OPERATE (RENEWAL)
1. Previous PTO (Photocopy)
2. Certificate of Good Running Condition / Safe for Public Use – Originally signed and sealed by PME and representative of maintenance provider- Stating among others that the maintenance in under contract with the maintenance provider
3. Latest monthly maintenance report (Elevator, Pumps, ICE, Escalator, ACU, etc.)4. PTR and PRC ID of PME (Photocopy) – with 3 specimen signatures
FORMS NEEDED:
- MECHANICAL PERMIT
- COMPLETION FORM